top of page

FAQS ON REFURBISMENTS AND EXTENSIONS:

WHERE TO START IN BUILDING / DESIGNING AN EXTENSION?

Please spend some time browsing our site to help create the image of your home extension in your mind. Then please contact Buildit.ie via the enquiry form or number above and we will take you through the entire home extension process from initial design and concept to final completion.

DO I NEED PLANNING PERMISSION FOR MY HOUSE EXTENSION?

It depends on the type, style and size of the proposed house extension. Each homeowner is entitled to exempted development of 40sqm of extended living space connected to the existing house as long as it is to the rear of the building. There is a separate allowance under exempted development for studios of up to 25sqm

WHAT IS A CERTIFICATE OF COMPLIANCE AND DO I NEED ONE FOR MY HOUSE EXTENSION?

Legislation requires that your house extension is built in compliance with the Building Regulation Act. If a house extension is in compliance, then a Certificate of Compliance may be issued by a qualified professional who has Professional Indemnity Insurance.  This certificate can only be issued either by an architect, engineer or chartered surveyor.  For a certificate to be issued, inspections of the construction drawings and of the building must be undertaken before the certificate can be issued.  All house extensions completed by Buildit.ie are constructed in compliance with the current Building Regulations, are inspected and issued with a Certificate of Compliance as part of our service.

WHAT KIND OF HOUSE EXTENSION WILL ADD THE MOST VALUE TO MY HOME?

A house extension that is well-designed, integrates with the existing space and has a quality build.  Good light and layout in the extension and existing space along with full certification and warranties from a reputable company ensure added value.

HOW LONG WILL MY HOUSE EXTENSION PROJECT TAKE?

Our package home extensions which typically range from 25-40 sq/m can take approx 8-10 weeks to turn key finish.

​

Typical new build homes ranging from 130-220 sq/m, can take approx 24 weeks to develop to turn key finish 

​

WORKING TO A BUDGET AND AFRAID OF COST OVER RUNS?

More than 95% of our projects come within budget.


Our success is based on planning in advance.

​

Comprehensive drawings and fixed pricing with our Electrical / Plumbing subcontractors / window suppliers reduce risk of any potential cost variations. 

​

​


​

FAQ: FAQ
bottom of page